Ask the Builder: How to ensure your concrete deck piers won’t fail

This round concrete deck pier might look shabby, but it might nonetheless be installed correctly so the deck post will not fail. (Tim Carter)
By Tim Carter Tribune Content Agency

Q. I’m concerned about the concrete deck base that’s fully above ground at my new home. The other decks in our development have the concrete piers below ground. Shouldn’t the concrete be completely buried to protect against freezing and cracking in the winter months? What do you feel are the best concrete deck foundation details? – Jeff K., Falling Waters, West Virginia

A. I love questions like this. I can understand concern based on the data sample you’re considering. It’s not far-fetched to worry that your deck foundation piers are wrong when they are the only ones that look like it in the neighborhood.

But think about this: Is it possible that your carpenter was the only good one in the development, and the other ones are ill-informed and lack critical thinking skills? You bet it’s possible. I see it every day in the photos and emails I get on my website.

The photos sent show me that the builder or carpenter got everything right as far as what’s supposed to happen above ground. It would take less than an hour with a round point shovel to determine if the deck pier extends below the frost level and has a wider concrete footing on which the circular deck pier rests.

Let’s discuss deterioration concerns first. Concrete is an artificial manmade rock. If it’s mixed and installed properly for local weather conditions, it can last for hundreds of years. If you want proof, visit a few railroad bridges in your area that have poured concrete abutments that support the bridge structure. I’ve seen concrete bridgework that was placed in the early 1900s that looks in excellent shape.

You also can look around to see above-ground poured concrete house foundations that might be 80 or more years old. It’s all about adding enough Portland cement to the mix and making sure you don’t add too much water or use water to finish the concrete. Curing the concrete to slow the release of the mix water also is very important.

Frost heave is another factor for concern. Soils that contain water in freezing climates can expand, and they go up in almost all cases. Where I live in central New Hampshire, the soil around my house goes up at least 3 inches each winter. It can go up even more if there’s an active spring under the soil. Ice lenses grow and grow, pushing the soil above them higher as the bitter weather drives the frost deeper in the soil.

Builders, engineers, architects and building inspectors are all aware of the frost depth in a local area. I’ve got a drawing on my askthebuilder.com website showing the frost depth across many areas of the U.S. If you live in the farthest northern reaches of Minnesota or Maine, you might have to dig down 6 feet or more to get a foundation footing below the depth that frost penetrates.

You want your deck piers to be below the frost level so the deck doesn’t lift up. This kind of unwanted force can cause severe structural damage to the deck.

I’ve worked with many architects and engineers in my building career. Most of their plans agree: It’s important to spread out the concentrated load of the deck posts across as much soil as you can. Usually, a 6- or 8-inch thick, 2-foot diameter poured concrete pad below the frost depth is sufficient to distribute the weight of the deck.

There are all sorts of ways to install a deck foundation base or pier. The most ingenious method I’ve seen to date – and I used this on my own deck and for shed foundation piers I built four years ago – is a plastic deck pier form you snap together on the job site. It even comes with all the required pre-bent and pre-cut reinforcing steel rods. I’ve got several videos of this marvelous deck pier system on my website.

This deck pier form is designed so its base is flared out at the bottom so it spreads out the concentrated load. You just dig the hole to the correct depth, make sure the soil is compacted, set the form in place and then immediately backfill around the form with the soil you just dug out of the hole. Add this soil slowly so you make sure the form doesn’t move. You then fill the form with the concrete, place the anchor bolt for the post base and wait one day to start building the deck.

I prefer to have the top of my concrete deck piers at least 4 inches above the final grade around the piers. I don’t want my treated lumber posts buried in the soil, as I’ve seen them rot and be a food source for termites. I always use a galvanized steel post base that keeps the bottom of the wood post up and off the poured concrete. This allows water to drain away from the wood.